Churchill River desk · Newfoundland and Labrador

Keep the power here. Watch the gates.

We make a huge amount of clean electricity — about 43 TWh a year — and ship most of it out. What matters is what we keep for industry here: mining and resources first, so Labrador and the island can build on firm power that stays. August's paper and the September House vote (21–18) are a and a political yes. The contracts that lock the power are still ahead.

Firm in-province power should serve Labrador and island industry, mining and resources first. Open People is a constituent and catalyst voice from St. John's. We are not a party to the agreement, an offtake seat, or a demand seat.

Last verified public documents onlyUNKNOWN labelled

The gate clockA time rail from 17 August 2026, when the framework was signed, to 31 March 2027, when its term ends. Gates: House vote 17 September, Québec election 5 October, binding target 31 December, term end 31 March. First Gull Island power is pencilled for 2036, off the scale.17 AugFramework signed17 SepHouse endorsed 21–185 OctQuébec votes31 DecBinding target31 MarFramework term ends2036first Gull Island powerpreliminary · Annex B

17 Sep

   

counting

House endorsed 21–18

5 Oct

   

counting

Québec votes

31 Dec

   

counting

Binding target

31 Mar

   

counting

Framework term ends

Gates on the Churchill Falls framework
DateGateKind
2026-08-17Framework signedfixed
2026-09-17House endorsed 21–18fixed
2026-10-05Québec votesfixed
2026-12-31Binding targettarget
2027-03-31Framework term endstarget
2036-01-01First Gull Island power (preliminary)preliminary

Solid dots are fixed dates. Dashed rings are stated targets in the DCIA text. The hatched square is a preliminary Annex B year. Nothing on this rail is a forecast by Open People. Full tracker →

  • — The cooperation paper was signed. It is not the contracts that lock the power.
  • — A political yes with no referendum. It does not write power-purchase contracts.
  • — The other government on the paper faces its voters. The party that signed is running third.
  • — The date the parties say they want the real contracts signed. A goal, not a deadline.
  • — The framework clock runs out unless the parties extend it in writing. Until then Hydro-Québec holds Gull Island exclusively.
  • — New megawatts are a decade out. The contracts that decide who gets them are months out.

01 — What we hold

One of the cleanest large power systems in North America. Most of it leaves.

Under the 1969-lineage contract, Churchill Falls export power has been priced at two , two tenths of a cent, until 2041. That is lore about what left the border, not a rate anyone here can buy power at today. The question now is not the export price. It is whether the province writes down what it keeps.

02 — What is still blank

Endorsement is not a contract.

Next public political gate: Québec, 5 October. Binding target around year-end. The Premier says the deal comes back to the House before then, but has not promised MHAs a vote. This is the stretch where public voice can still insist on transparency and in-province use, without pretending the deal is finished, and without a sermon against it.

01 · In-province use

Public talk is enough firm power for a few large industrial campuses, about 2,350 MW. It is still not a year-by-year signed list of who gets it.

02 · Recall

The paper describes a three-year notice to take power back. House testimony is not a signed contract.

03 · Innu Nation

asked MHAs not to vote and says the paper cuts its benefits by more than half. Partnership, royalty, and Gull Island tariff path are still open. As of 21 September no meeting is scheduled.

04 · Federal assessment

Ottawa has not yet confirmed this plant matches the older review. The 2026 description is larger than the roughly 2,000 MW studied then.

Full living board →

03 — The default path

If nobody writes anything else, the paper already decides.

The Material Terms describe what happens to retained power that is not used at home. It has a buyer. Leftover megawatts do not sit still by magic.

The default path for unused retained powerRetained power either serves domestic load in Newfoundland and Labrador, or, if unused, flows to Hydro-Québec under Section 4 options: synthetic export up to 280 MW, CHPE-equivalent up to 240 MW, NECEC-equivalent up to 200 MW, each on three years' notice, or unplanned unused energy at 95 percent of the PPA price with no notice, which Hydro-Québec must buy.Retained powerup to 2,350 MW · framingused here · “domestic load”not used · §4 optionsMines · towns · Labrador industrydefinition of “domestic load”: not publishedHydro-Québec buys italready written in the Material TermsSynthetic exportup to 280 MW · 3-yr noticeCHPE-equivalentup to 240 MW · 3-yr noticeNECEC-equivalentup to 200 MW · 3-yr noticeDiscounted PPA price95% of PPA · no notice · HQ must buy

Framework, not executed. These are Material Terms for later contracts. The point is that the west branch is already written and the home branch is not. Tracker row →

If NL does not use retained power at home, the paper already names ways Hydro-Québec can buy it, including a 95% default price if there is no three-year notice. What means in words a voter can check is still not written.

04 — The desk

Four doors. None of them is a campus.

05 — How we work

Rules we publish so you can hold us to them.

  • 01Evidence before narrative
  • 02No crypto — permanent
  • 03Never lead with “cheap power”
  • 04Indigenous engagement first-class
  • 05Partners own the steel

Full operating doctrine: Approach. is a separate page and never the front door: /compute.

If the next generation's firm power is going to be priced while this paper is still paper, we'd rather people were in it, not writing about it afterward.

Tom Lane · Founder, Open People
St. John's, Newfoundland and Labrador